Prepared a Specification for a Prefabricated Distribution Relay Vault and reviewed associated drawings prepared by FPL. This was a permanent prefab relay vault that will be a similar size to the building previously developed by FPL for its Roberts/Magnolia Transmission Substations, but for the distribution station. Additionally, ECF put together a spreadsheet for use when ordering the building to support the specification by defining who would be providing what items, including how they will be delivered.
Developed several modifications to HES Power System to accommodate a new 138 kV interconnection between Florida Power & Light Co. (FPL) and HES Networks. Final recommendation was a new intertie by looping the FPL Davis to Florida City #2 138 kV Line and HES Lucy 138 kV Line at the new HES Redland Distribution Substation site.
ASPEN modelling of the system in order to provide coordination studies, configuration settings, and settings basis for GE & SEL protection relays. Developed HMI interfaces & data maps between HMI equipment, RTAC, IED relays, meters, etc. Developed communications and modem & Ethernet setups as well. Performed field FAT tests and designed the FAT procedures.